Entry #16: 5th November 2010

Remember remember the 5th of the November! Today was our ‘intended’ finnish day.... and we are so so close. 
The weather has been the factor slowing us down over the last week and if we hadn’t had it contend with this on top of everything else we would definitely finished by now. 





Uploaded with ImageShack.us


We have now got all the sarking and cladding pieces moved down to the site so we are all go; thanks to Trevor at the Botanics who helped us move this down with his van and trailer.
By the end of today we have just got cladding on the top third to complete; this is the 4.8m strips which wont need cutting, just placing and nailing. There are a few infill bits left to cut which will be slotted into the remaining gaps and then there’s the floor. 





Uploaded with ImageShack.us


We are aiming for a finnish time of lunchtime on Saturday; we shouldn’t run to much over that hopefully!